A pool surround rebuilt from the trenches up: piping pressure-checked and backfilled first, then a paver deck pitched away from the coping.
Project scope
- Removal of a failing pool surround surface
- Pool piping runs to the equipment location
- Wide bluestone coping at the pool edge
- Paver pool deck with perimeter drainage
Site considerations
- Everything below the deck had to be finished and verified before the surface went down, because cutting into a finished pool deck later is the expensive outcome.
- The surface is walked on barefoot and stays wet, so texture and joint layout mattered as much as the base.
Work completed
- Suction and return lines were routed, supported and pressure-checked with the trenches still open, then backfilled and compacted.
- Coping was set first to establish the finished edge, with pitch running away from the pool on every side.
- The paver field was laid to the coping with a soldier course, and perimeter drainage was tied in before final compaction.
Mid-Cape
Project gallery
Start a project
Tell us what you want built
Send the details of your masonry, patio, retaining wall, pool or demolition project and we will follow up to arrange a site visit.